RATE CHART OF AUTO SOLUTION |
|||
| PARTICULARS | Upto 1000cc | Upto 1500cc | Upto 2500cc |
| COOLING SYSTEM | Taka | Taka | Taka |
| Radiatr cleaning and servicing | 800 | 1000 | 1500 |
| Water pump replacement | 800 | 1000 | 2000 |
| Coolant replacement | 100 | 150 | 200 |
| Theromostat switch replacement | 150 | 150 | 150 |
| Cooling fan replacement | 250 | 350 | 400 |
| Hose pipe replace (each) | 100 | 150 | 200 | CLUTCH SYSTEM |
| Clutch plate replacement FWD | 1200 | 1400 | 2000 |
| Clutch plate replacement 4WD | 2000 | 2500 | 3000 |
| Clutch sleeve cylinder kit replacement | 460 | 450 | 500 |
| Speedometer cable replacement | 400 | 600 | 800 |
| TRANSMISSION SYSTEM | |||
| CV joint replacement(each) | 400 | 600 | 800 |
| CV joint &boot cover replacement(each) | 300 | 400 | 500 |
| Gear box overhauling | 5000 | 5500 | 8000 |
| Transmission oil seal replacement | 350 | 450 | 500 |
| Universal joint replacement | 400 | 450 | 500 |
| ATF change (Manually) | 500 | 600 | 700 |
| ATF change with flushing | 1000 | 1200 | 1500 |
| Gear box opening and fiting | 550 | 600 | 800 |
| SUSPENSION SYSTEM | |||
| Suspension system overhauling | 1200 | 1500 | 3000 |
| Shock absorber replacement (each) | 400 | 450 | 500 |
| Leaf spring replacement | 600 | 600 | 1000 |
| STEERING SYSTEM | |||
| Steering system overhauling | 1500 | 2000 | 3000 |
| Rack end replacement (each) | 250 | 300 | 400 |
| Hanger replacement (each) | 300 | 350 | 400 |
| Ball joint replacement (each) | 200 | 250 | 300 |
| Tie rod end replacement (each) | 200 | 250 | 300 |
| Steering bush replacement (each) | 300 | 350 | 400 |
| Steering gearbox servicing manual | 400 | 500 | 600 |
| Power steering fluid changing | 150 | 150 | 150 |
| Steering box replacement | 800 | 1000 | 1500 |
| Power steering system flushang | 400 | 500 | 550 |
| BODY WORK | |||
| Windshield/windscreen fitting-adhesive | 1000 | 1200 | 1250 |
| Door class fitting (each) | 250 | 350 | 350 |
| Door bush replacement (each) | 400 | 400 | 600 |
| Muffler/Silencer box fitting | 200 | 250 | 250 |
| Paint full body (Labour charge) | 6000 | 8000 | 10,000 |
| CAR WASH | |||
| Car wash vacuum clean & oil change | 250 | 300 | 400 |
| Car polish & clean up | 1000 | 1200 | 1500 |
| Interior clean up | 1000 | 1200 | 1500 |
| a)Front & rear seat | 300 | 400 | 500 |
| b)Floor carpet wash | 200 | 250 | 300 |
| c)Floor carpet wash | 600 | 750 | 800 |
| WHEEL | |||
| Alignment checking | 500 | 600 | 800 |
| Alignment adjustment (toe) | 800 | 1000 | 1200 |
| Camber or kpi caster adjustment | 300 | 400 | 500 |
| Computerized wheel balancing | 200 | 250 | 350 |
| Wheel rotation | 200 | 300 | 400 |
| Wheel bearing replacement-each RWD each | 450 | 650 | 850 |
| Wheel bearing replacement -each FWD each | 400 | 600 | 800 |
| Wheel bearing adjustment each | 100 | 150 | 250 |
| Tube repair | 60 | 80 | 100 |
| Tubeless tyre repair | 80 | 100 | 120 |
| Drum turning each | 100 | 150 | 200 |
| Disk turning each | 200 | 300 | 400 |
| BRAKE SYSTEM | |||
| Brake servicing | 400 | 600 | 800 |
| Cleaning and changing of shoes & pads | 500 | 550 | 650 |
| Brake system overhauling | 600 | 700 | 100 |
| Wheel cylinder service per wheel | 200 | 200 | 300 |
| Brake booster replacement | 400 | 600 | 1000 |
| Hand brake cable change (each) | 300 | 300 | 350 |
| Brake master cylinder kit change | 600 | 800 | 1000 |
| Brake system bleeding | 300 | 350 | 400 |
| Bleeding with flushing | 500 | 600 | 650 |
| Brake shoe adjustment | 400 | 450 | 500 |
| ELECTRICAL SYSTEM | |||
| Self starter servicng | 400 | 600 | 800 |
| Alternator servicing | 450 | 600 | 1000 |
| Horn replacement and adjustment | 100 | 100 | 100 |
| Electric accessories fitting (each) | 100 | 100 | 100 |
| Electric line check up/repair | 1000 | 120 | 1500 |
| Head light beam adjustment | 300 | 400 | 500 |
| Battery charging & checkup | 50 | 60 | 70 |
| A/C SYSTEM | |||
| Gas charge-134 | 1500 | 1800 | 2200 |
| Gas charge-R-12 | 1000 | 1200 | 2000 |
| A/C system servicing | 1200 | 1500 | 2000 |
| A/C fan replacement | 200 | 200 | 200 |
| A/C compressor bearing replacement | 400 | 600 | 1000 |
| PETROL | |||
| Distributor C.B point & condenser replacement | 200 | 200 | 400 |
| DISEL | |||
| High pressure pump and injector opening sitting | 1400 | 1600 | 2000 |
| FUEL SYSTEM | |||
| Carburetor servicing or kit change | 600 | 800 | 1500 |
| Fuel fitter replacement system EFI | 200 | 250 | 250 |
| Fuel tank wash | 800 | 1000 | 1200 |
| Fuel Pump (EFI) system replacement | 600 | 800 | 1000 |
| LUBRICATION SYSTEM | |||
| Oil pressure switch replacement | 200 | 350 | 500 |
| Oil pump replacement | 600 | 800 | 1500 |
| Oil pump strainer cleanine | 1000 | 1200 | 1500 |
| ENGINE | |||
| Computerized engine tune up | 1000 | 1200 | 1400 |
| Computerized engine check up | 800 | 1000 | 1200 |
| Computerized diagosis (OBD) | 800 | 1000 | 1200 |
| Valve/Tappet Adjustment (Mechanical Type) | 300 | 500 | 600 |
| Tappet adjustment (Hydraulic Type) | 1000 | 1200 | 1500 |
| Carburetor sericing | 600 | 800 | 1200 |
| Throttle servicing | 500 | 600 | 800 |
| Engine overhauling(Major) | 4000 | 5500 | 8000 |
| Engine timining belt, seal & bearing replacement | 600 | 800 | 1500 |
| Main oil seal replacement | 1200 | 1500 | 1500 |
| Oil sump gasket replacement | 600 | 800 | 2000 |
| Head gasket replacement | 800 | 1000 | 2000 |
| Engine mounting replacement (each) | 400 | 500 | 550 |
| Injector servicing | 500 | 600 | 800 |
Related Topics: Company Profile | Equipments | Location Map | Our Service